Delta Projects
Integrated Systems Inc. handles the HVAC control systems for three different Delta Airlines auxiliary buildings, all of which are located in Hapeville, GA just north of Hartsfield-Jackson International Airport. Of those three buildings, Delta Data Center is the largest and most extensive control job. At 382,000 square feet, the Mission Critical job requires 325 American AutoMatrix controllers and 6 PNC area controllers. ISI also does controls for Delta's Reservations Building and Operation Control Center 3. Both of these buildings are of comparable size (~200,000 square feet) and require a total of 473 VAV controllers and 5 area controllers. We have built a great relationship with Delta over the last five years and hope to continue our great relations in the future.